Maintenance Programme 2005

Please find below the Transco FINAL (Version 2), Summer 2005 Maintenance Plan. This satisfies Transco’s Network Code obligations to publish a FINAL maintenance plan detailing maintenance and expansion work on Transco’s Gas Transmission System (the NTS).

Document published 08.07.05 (PDF - 1.4MB)

For further information on this document only, please contact Andy Barwick in the Physical Strategy Team of Gas Operations on (01926) 653235.

October Maintenance Programme 2005 – Final v2

Please find below the FINAL (Version 2) of the October Maintenance Programme 2005. This document is pursuant of the requirements for Transco under Section L 1.2.3 of the Network Code.

Document published 27.09.05 (PDF - 93KB)

Maintenance Programme 2006 – Draft v1

Please find below the Transco DRAFT (version 1), Summer 2006 Maintenance Plan. This initial DRAFT version of the 2006 Maintenance Programme has been produced by Transco to satisfy its obligations under section L 1.2 of the Network Code.

Document published 15.04.05

For further information on these documents only, please contact Andy Barwick in the Physical Strategy Team of Gas Operations on (01926) 653235.

Deliverability with respect to Planned Maintenance

This section contains information on maximum supply deliverability, for the forthcoming 12 month period and is produced by the combination of TBE maximum deliverabilities and planned maintenance activities for all sub terminal and storage facilities. The data is provided on an aggregated North / South basis.
This information satisfies the requirements for Category 3 of the DTI Information Initiative, Phase 3.

For further assistance on this information, please contact Ian Barnes in the Operational Agreements team within Gas Operations on (01926) 654035